05 June 2013

Wing Work


Trailing edge fitting into rear of rib
Over the weekend, through Tuesday, we got a lot of work done on the wing test section.  We built all 20 ribs, including the two hard ribs that go on the end to take all the Mylar tension, we built all the trailing edges, and we developed the methods for bending the Depron leading edge.  Starting Wednesday, we will assemble the full wing test section (6.66 m long, representing a full center section of the DaSH v5 wing, but with an aluminum dummy spar in place of carbon fiber).

More photos of the last few days follow:

Bending the trailing edge of the Depron Leading Edge
The end result of a bent edge at 90 degrees

Vacuum bagging the plywood doublers on the hard end ribs

Brackets for the Depron leading edge bending tool

Heating element inside 3/4" OD Al tube used for Depron LE bending

The hard ribs out of the vacuum bag

Most of the test section ribs in various states of assembly

Applying Polyurethane glue to rib doubler
Squeegeing the polyurethane on the doubler

Main spar doubler in place, rear doubler ready to go

A Rib Sandwich -- 6 ribs clamped together to provide pressure for doubler gluing

The dummy spars

Spare ribs with doublers added for 1" dummy spar to make a 3 rib test section

Hot wiring a spar hole



Trailing edges and test pieces under vacuum

The real spars are light!

Measuring trailing edge before cutting

Cutting the long dimension on the trailing edge



Trailing edge foam core after cutting



Trailing edges & test pieces (foreground)

Peeling plastic off top surface on test piece, now our preferred, lightest, strongest build method

The new repaired hot wire machine, with new strong, flat base



First airfoil section cut from repaired, improved hot wire machine

A frog visitor to DaSH Boot





No comments:

Post a Comment