| Ribs ready to be clamped, after gluing doublers |
We continue to build ribs and end ribs for the Outer Wing Sections and Longer Outer Wing Sections. It will take us a couple of weeks to glue and clamp all the doublers to the ribs, and the rib caps to the end ribs.
| The rib factory in action |
| Sanding rib caps after slicing on bandsaw, to remove splinters and make rib caps smooth |
| The Outer Rear Spars getting ready to cut to length. |
| Cutting Outer Rear Spar -- excess pieces will be used as support tubes in wing |
| A bunch of wing ribs, clamped |
| Cutting rib caps to proper width for end ribs |
| Cutting Rib Caps to length |
| Rib Caps cut to length, ready to be glued |
| Glued rib caps on end rib, waiting for vacuum bagging |
| Vacuum bagged ribs (in background) |
No comments:
Post a Comment